Georgia “Upgrade of Water Supply and Sewerage Systems in Khashuri”

Within the scope of the project, the estimated work to be done includes the following:

WATER SUPPLY:

  • 200 km of water distribution pipelines (HDPE 63 mm diameter to 450 mm including fittings)
  • Creation of 11 district meter areas (DMA)
  • 8,490-pcs house connections
  • 185-pcs fire hydrants (Underground – 175 pcs; Aboveground – 10 pcs)
  • 398-pcs Gate valves (Diameter from DN 80 to DN 300)
  • 2-pcs Butterfly Valve (DN 350 – 1pcs; DN 400 – 1 pcs)
  • 15-pcs Washout Valve with Chamber (DN 80 – 5 pcs; DN 150 – 10 pcs)
  • 15-pcs Air Valve with Chamber (DN 50 – 5 pcs; DN 80 – 10 pcs)
  • 11-pcs Flowmeter
  • 4-pcs PRV
  • 7200-pcs Single jet water meters DN 15
  • 2268-pcs Single jet water meters DN 20
  • 720-pcs Single jet water meters DN 25
  • 38-pcs Roundabout, Highway or Railway crossings
  • 14-pcs River crossings
  • 192 000 m2 Reinstatement of roads
  • 20 000 m2 Reinstatement of pavement
  • 25 000 m2 Reinstatement of green spaces
  • Installation of communication system for each data logger for communication of data to the SCADA system. Including:
  • Supply of exchange table for the SCADA system
  • Transference of the existing connections from the existing network to the new one.
  • Decommissioning of existing water pipeline

WASTEWATER:

  • 45 km of gravity wastewater pipelines with diameters from 200 mm to 800 mm
  • 1098-pcs Manholes & inspection chambers
  • 2000-pcs House connections
  • 5-pcs Roundabout, Highway or Railway crossings
  • 5-pcs River Crossing
  • 37 000 m2 Reinstatement of roads
  • 6500 m2 Reinstatement of pavement
  • 9500 m2 Reinstatement of green spaces
  • Decommissioning of the existing network