ALMATY INTERNATIONAL AIRPORT, FIRST DEVELOPMENT PHASE OF AIRSIDE INFRASTRUCTURE PROJECT

The project covers the infrastructural modernization of the existing airside facilities of the airport, which is established on an area of 421.96 hectares. Within this scope, a total of 944,830 m² of runway and apron areas will be reconstructed, along with 367,990 m² of surface rehabilitation works.
The Almaty International Airport, First Development Phase of Airside Infrastructure Project consists of the reconstruction of a 332,800 m² concrete runway, construction of a 319,600 m² parallel taxiway and service roads, development of a new 160,780 m² cargo apron, reconstruction of a 56,590 m² VIP apron and 90,130 m² de-icing aprons, as well as a total of 944,830 m² of runway and apron works and 367,990 m² of surface rehabilitation, all within a 421.96-hectare project area.