Georgia “Upgrade of Water Supply and Sewerage Systems in Khashuri”
Within the scope of the project, the estimated work to be done includes the following:
WATER SUPPLY:
- 200 km of water distribution pipelines (HDPE 63 mm diameter to 450 mm including fittings)
- Creation of 11 district meter areas (DMA)
- 8,490-pcs house connections
- 185-pcs fire hydrants (Underground – 175 pcs; Aboveground – 10 pcs)
- 398-pcs Gate valves (Diameter from DN 80 to DN 300)
- 2-pcs Butterfly Valve (DN 350 – 1pcs; DN 400 – 1 pcs)
- 15-pcs Washout Valve with Chamber (DN 80 – 5 pcs; DN 150 – 10 pcs)
- 15-pcs Air Valve with Chamber (DN 50 – 5 pcs; DN 80 – 10 pcs)
- 11-pcs Flowmeter
- 4-pcs PRV
- 7200-pcs Single jet water meters DN 15
- 2268-pcs Single jet water meters DN 20
- 720-pcs Single jet water meters DN 25
- 38-pcs Roundabout, Highway or Railway crossings
- 14-pcs River crossings
- 192 000 m2 Reinstatement of roads
- 20 000 m2 Reinstatement of pavement
- 25 000 m2 Reinstatement of green spaces
- Installation of communication system for each data logger for communication of data to the SCADA system. Including:
- Supply of exchange table for the SCADA system
- Transference of the existing connections from the existing network to the new one.
- Decommissioning of existing water pipeline
WASTEWATER:
- 45 km of gravity wastewater pipelines with diameters from 200 mm to 800 mm
- 1098-pcs Manholes & inspection chambers
- 2000-pcs House connections
- 5-pcs Roundabout, Highway or Railway crossings
- 5-pcs River Crossing
- 37 000 m2 Reinstatement of roads
- 6500 m2 Reinstatement of pavement
- 9500 m2 Reinstatement of green spaces
- Decommissioning of the existing network