Infrastructure Projects

Ordu Ring Road Km: 21+000-42 + 414,784 Section Extension Construction Works

An extension tender was issued due to a route modification made on the previously 19.1 km-long Ordu Ring Road Project, designed to provide better standards for transit traffic and alleviate interurban traffic load, whereby the project length was extended to 21.42 km. Construction of the Ordu Ring Road Project Extension Construction Works, awarded to Nurol (40%) – Yüksel (25%) – YDA (25%) – Özka (10%) Partnership by the General Directorate of Highways, was started in August 2017. The rate of completion at end of 2017 was 2.75%. The targeted date of completion is August 2020.