Infrastructure Projects

E-90 Highway Tugay Flyover Junction (Gaziantep)

Within the scope of this clover-leaved flyover junction project, the works of 145,000 m3 excavation, 1,450 m bored pile, 35,000 m2 asphalt coating, and filled precast wall coating were done.